Nairobi tested scheduled bus departures and fixed fares along Ngong Road in 2025, offering commuters a glimpse of a more predictable public transport system. More than a year later, questions remain about whether the experiment has produced lasting improvements.
For decades, Nairobi commuters have endured an unpredictable public transport system where departure times frequently depend on how quickly a vehicle fills up, fares fluctuate with demand, and passengers have little certainty about when they will reach their destinations.
The challenge is familiar across many of the city’s busiest corridors, from Thika Road and Jogoo Road to Ngong Road and Waiyaki Way.
For passengers navigating the capital, understanding Nairobi’s matatu routes and transport connections is only part of the journey. Knowing when a vehicle will depart and how much the trip will cost remains equally important.
In April 2025, the Nairobi Metropolitan Area Transport Authority (NaMATA), working with the Japan International Cooperation Agency (JICA), introduced an experiment intended to address some of these longstanding problems.
The Route 111 Pilot Project, operating between Nairobi’s Central Business District and Ngong, tested a more organised public transport model built around scheduled departures, standardised fares, passenger safety and improved service delivery.
Instead of relying entirely on vehicles filling up before departing, participating operators worked under a coordinated departure system.
The experiment offered a glimpse of what Nairobi’s public transport could become without necessarily waiting for expensive new roads or a fully operational Bus Rapid Transit network.
But with the pilot concluded, an important question remains: what happened next?
A Public Transport Experiment Involving 40 Vehicles
According to JICA’s published evaluation, the Route 111 pilot operated between April 3 and May 2, 2025, covering approximately 22.2 kilometres between Nairobi’s CBD and Ngong Terminus.
The programme brought together 10 public transport operators using 40 vehicles, supported by 80 drivers, 80 conductors and 40 stage supervisors.
Participating operators included established public transport companies and SACCOs such as Super Metro and Metro Trans.
The objective was not simply to move passengers between two destinations. It was to test whether coordinated operations could improve the quality, reliability and accessibility of Nairobi’s existing public transport services.
Under the pilot, weekday operations ran from 4 a.m. to 10 p.m., while weekend services operated between 6 a.m. and 8 p.m.
The project also introduced driver and conductor training, passenger safety measures and greater consideration for persons with disabilities and other vulnerable commuters.
For passengers travelling between Nairobi and Ngong, the initiative represented a different approach to urban mobility.
Scheduled Departures Instead of Waiting for Vehicles to Fill
One of the most significant aspects of the pilot was its departure scheduling system.
During peak hours, the programme targeted departures approximately every five minutes, with longer intervals during off-peak periods.
This challenged one of the most deeply established practices in Nairobi’s public transport industry: vehicles remaining at stages until sufficient passengers have boarded.
The traditional system places much of the operational uncertainty on commuters.
A passenger may arrive at a stage without knowing whether the next vehicle will depart immediately or remain parked for several minutes.
For workers, students and other passengers travelling under strict schedules, those delays can create considerable inconvenience.
A properly implemented timetable changes that relationship.
Rather than passengers adjusting their lives around the availability of vehicles, transport operators organise their services around predictable departure times.
This principle could eventually benefit commuters using other major transport corridors, including the Thika Road public transport network, where thousands of passengers depend on daily connections between Nairobi and surrounding residential areas.
It is a principle already familiar in cities with developed bus and rail networks.
And it does not necessarily require an entirely new fleet of vehicles to begin implementation.
Fixed Fares: What the Pilot Discovered
Another major feature of the Route 111 experiment was the introduction of standardised fares.
Nairobi commuters are familiar with fare fluctuations, particularly during peak periods, rainy weather and disruptions to normal transport operations.
Under the pilot, operators were expected to follow an established fare structure.
JICA’s evaluation found that the fixed-fare system was largely implemented successfully.
Although conductors occasionally charged less than the stipulated fare on certain sections, the evaluation reported that fares did not exceed the fixed tariff.
The findings suggested that fare predictability had improved during the trial.
This was a significant observation.
It demonstrated that coordinated operational rules could help address fare uncertainty rather than leaving pricing entirely to individual vehicle crews.
For passengers managing daily transport expenses, knowing the cost of a journey in advance can be just as important as knowing when a vehicle will depart.
What Happened After the Pilot Ended?
The Route 111 project officially concluded in May 2025.
NaMATA subsequently acknowledged the contribution of participating operators and commuters, stating that the experience would help inform future improvements to public transport in the Nairobi Metropolitan Area.
However, the longer-term impact of the experiment deserves closer examination.
As of November 2026, the publicly available information reviewed for this article does not establish whether the original scheduling and fixed-fare arrangements have been maintained across Route 111 or expanded into a permanent, citywide programme.
This does not necessarily mean the initiative was abandoned.
NaMATA continues to identify its partnership with JICA on bus operation policy and management as part of its transport improvement programmes.
Nevertheless, the distinction between conducting a pilot and delivering lasting commuter benefits is important.
A pilot can demonstrate that a particular system works under controlled conditions.
The real test is whether those improvements survive after the experiment ends, participating operators return to normal commercial operations, and additional routes are introduced.
For Nairobi, that is where the Route 111 experience becomes particularly relevant.
Could Electric City Buses Provide the Missing Link?
The experiment also raises an important question about the future of electric public transport in Kenya.
Nairobi’s emerging electric bus industry presents an opportunity to combine cleaner vehicles with more predictable services.
Companies investing in electric mobility are introducing vehicles that could support a more modern approach to urban transport.
However, electrification alone cannot solve the city’s public transport problems.
An electric bus operating without a reliable timetable may reduce tailpipe emissions, but it does not automatically eliminate uncertainty for passengers.
Similarly, a modern bus can still spend unnecessary time waiting at a stage if the operating model remains unchanged.
The greater opportunity lies in combining electric buses with scheduled departures, coordinated route management, clear passenger information and transparent fare systems.
Readers can explore the latest electric bus developments in Kenya, including the growing role of electric mobility companies in transforming urban passenger transport.
Electric buses also introduce operational considerations that make scheduling particularly important, including charging times, vehicle availability and fleet utilisation.
A well-managed timetable can help operators coordinate those requirements while delivering more consistent services.
For Nairobi, the long-term ambition should therefore extend beyond replacing diesel vehicles with electric alternatives.
It should involve changing how public transport is organised.
Nairobi’s BRT Plans and the Bigger Picture
The Route 111 experiment took place against the backdrop of Nairobi’s longstanding efforts to develop a Bus Rapid Transit network.
NaMATA has identified five BRT corridors intended to improve movement across the metropolitan area.
Among them are the Simba corridor along Thika Superhighway and the Chui corridor, intended to improve connectivity between eastern Nairobi and other parts of the city.
These projects involve infrastructure, investment, service planning and coordination between multiple public institutions.
However, the Route 111 pilot demonstrated that some improvements to passenger experience can be tested before major infrastructure projects are completed.
Scheduled departures, consistent fares, better-trained crews and clearer passenger information do not necessarily depend on constructing an entirely new transport corridor.
They depend heavily on coordination, enforcement and the willingness of operators to adopt common service standards.
The same principles are relevant to Nairobi’s Bus Rapid Transit development plans, which are intended to create a more organised and efficient metropolitan transport network.
That distinction matters for a city where major infrastructure projects can take years to complete.
What Nairobi Commuters Should Be Asking
The Route 111 pilot provides an opportunity to evaluate public transport reform against measurable outcomes rather than announcements.
Several questions deserve answers.
Has NaMATA established a permanent operating model based on the pilot’s findings?
Are participating operators continuing to use coordinated schedules and standardised fares?
What did the financial analysis reveal about the commercial sustainability of scheduled services?
And are there plans to replicate the model on other busy corridors, including Thika Road, Jogoo Road, Waiyaki Way and Mombasa Road?
The answers would help determine whether the initiative was a temporary demonstration or an important step towards lasting public transport reform.
For commuters, the most meaningful measure of success is not the number of pilot projects launched.
It is whether they can arrive at a bus stop, know when their vehicle will depart, understand what they will pay and reach their destination with reasonable predictability.
The Real Public Transport Revolution Is Reliability
Nairobi does not lack public transport vehicles.
What remains a challenge is organising those vehicles into a consistently reliable, accessible and passenger-focused network.
The Route 111 pilot demonstrated that coordinated departures and predictable fares could be introduced through cooperation between government agencies and existing transport operators.
Its findings offer useful lessons for the development of Nairobi’s future public transport system.
But more than a year after the experiment ended, the public deserves clarity on how those lessons are being applied.
As Kenya invests in electric buses, BRT infrastructure and wider urban mobility reforms, the Route 111 experience should remain part of that conversation.
For commuters following public transport news and developments across Kenya, the bigger question is whether new investments will translate into measurable improvements in everyday journeys.
Because the ultimate measure of a modern transport system is not simply how new its buses look, how much infrastructure has been constructed or how many projects have been announced.
It is whether commuters can depend on the service every single day.
And for Nairobi, that may be the most important transport reform of all.





